Frontline HR Software Evaluation Matrix: 25 Questions

Last updated

Hypothetical: A procurement committee receives five vendor responses to the same RFP, and each response answers the mobile question with the word yes. If you are building an enterprise procurement evaluation matrix for frontline hr software, that yes tells you little. A score has to say what evidence stands behind it. This guide gives you 25 questions in five gates, plus a scale that scores the evidence behind each answer.

The W3C says WCAG 2.2 has 13 guidelines under four principles and three conformance levels, A, AA and AAA. That is a useful example of a question with a checkable answer. A vendor can name a standard, a version and a level, and a committee can ask to see the report. The 25 questions below follow the same pattern.

HR Cloud publishes this guide and sells frontline HR software, so read the HR Cloud section with that in mind. The questions are vendor-neutral, and the guide does not rank any vendor. HR Cloud facts come from its help center, pricing page and product page, all opened on November 26, 2026. Review sites and HR Cloud's own comparison pages are not used as sources.

Frontline here means workers who spend their shifts away from a desk, such as plant, store, clinic and field staff. Enterprise has no headcount threshold in this guide, because your own procurement policy sets that line. Scorecard and matrix mean a weighted table that a committee fills in. No published standard sets these 25 questions, so the question set is this guide's own.

Short answer: What belongs in an enterprise procurement evaluation matrix for frontline hr software? Ask 25 questions in five gates called Reach, Work, Connect, Protect and Commit, and score each answer by the evidence behind it. The scale runs from shown live to not found. Table 1 defines the scale, and Tables 2 to 4 list the questions.

Key Takeaways

  • Score the evidence behind each answer. Table 1 defines a four-point Evidence Scale, from shown live on your own data to not found on pages checked.
  • Table 2 lists ten questions for the Reach and Work gates. One asks whether a worker with no company email can sign in on a personal phone.
  • Table 3 lists ten questions for the Connect and Protect gates, covering integrations, sign-in, data handling and administrator controls.
  • Table 4 lists five Commit questions on implementation scope, stated timelines, licensing basis and exit.
  • Table 5 lists what HR Cloud's help center documents for each gate, plus what was not found on pages checked.
  • Table 6 lists the decisions to write down before the RFP goes out, including who sets the weights.

What Should an Enterprise Procurement Evaluation Matrix Score?

A matrix has two parts, the questions and the scale. Committees tend to spend their time on the questions and borrow a scale from a template. The scale decides whether two evaluators reach the same score for the same answer. This guide uses a scale built on evidence types, because evidence is easier to agree on than quality.

Table 1 defines four scores. The top score, 3, means the vendor showed the answer live, using your own sample data. A 2 means a first-party page documents it, such as a help center article or a pricing page.

Next comes 1, which means the vendor stated it in writing, with no page or demo behind it. Zero means nothing was found on the pages checked.

The scale has a built-in rule: a vendor moves up only by showing more. A confident sales answer scores 1 whatever the tone. Documentation alone scores 2 until someone watches it work. That keeps a smooth presenter from outscoring a quiet one.

Weights are a separate step. No source opened for this guide sets a universal weighting for HR software. Your committee should set weights before any demo, and write them down, so that a favorite vendor has no way to reshape the weights afterward.

Table 1. The Evidence Scale. This guide's framework, with no published standard behind it, as of November 26, 2026.

ScoreLabelWhat countsExample
3Shown liveThe vendor performs the task during a demo using your sample dataA worker account created with a phone number and signed in on a personal phone
2DocumentedA first-party page states it, and you have the linkA help center article describing the setup steps
1StatedThe vendor says so in writing with no page or demo behind itA line in an RFP response
0Not foundNothing found on the pages checked, which are listed in your notesNo page states a conformance level

A zero is a statement about the pages you checked and nothing broader. Before you record one, look at the vendor's product pages, help center, pricing page and recent updates, and write down which ones. A feature can launch between your first look and your final demo, so date each score.

Why this matters for Procurement and RFP Committees: A score that cites its evidence can be defended in an appeal or a review. A score that cites a feeling has no defense, and a vendor that loses can ask why.

Gate 1: Can Frontline Workers Actually Be Reached?

Reach comes first because the later gates assume the worker can get in. A platform may work for office staff and fail for people on a floor, a route or a ward. Then only the first group adopts it. Gate 1 asks five questions, numbered 1 to 5 in Table 2.

Question 1 asks whether a worker with no company email and no work laptop can sign in for the first time. Ask to see an account created with a phone number only, then signed in on a personal phone. Question 2 covers language. Ask for the list of supported languages, who sets the language, and a live switch on a phone.

Question 3 is about accessibility. Ask which standard the vendor claims, which version and level, and when it was tested.

According to the W3C's page on what changed, WCAG 2.2 became a W3C Recommendation on 5 October 2023. It adds 9 success criteria to WCAG 2.1. A claim that names no version and level has not told you much.

Question 4 asks which worker tasks run in the mobile app and which need a browser. Ask for a task-by-task list and a live walkthrough. Question 5 tests a weak connection. Start a form, drop the connection, and return to see what was kept.

Hypothetical: A committee member starts a form on a personal phone, switches to airplane mode, and reopens the form. The test states no result. It shows what a worker on a spotty connection would meet, and it needs only a phone.

Pro tip: Run Gate 1 on a phone that is not a company device. Company devices hide the problems that a worker with a basic phone will meet.

Gate 2: Which Daily Workflows Should the Scorecard Test?

Gate 2 covers the work the platform is bought to do. Keep it to the workflows your frontline staff touch in the first weeks. A long feature list invites scoring features nobody will use.

Question 6 asks whether tasks can be assigned by rule, such as by location, position or a status change. Ask for a rule built live and the help page that names the criteria. Question 7 covers forms. Ask how a form is completed and signed, and where signed forms and uploaded files are stored afterward.

Question 8 applies only if time or scheduling is in scope. Ask which module covers it, and whether it sits in the quoted plan or an add-on. Question 9 asks how a message reaches workers with no email, and whether HR can see who read it. Finally, Question 10 asks what a site manager sees about overdue tasks, and how that view is shared.

Score each of these on the Evidence Scale. A vendor may document a workflow well and still fail to show it on your sample data. That is a 2 until the demo runs, and the gap is worth a note.

Give each vendor the same ten sample records ahead of the demo. The records might include a new hire at a remote site, a rehire and a worker with a second language. A shared test set makes the scores comparable, since each vendor then works from the same facts.

Where the data helps: Your own sample records show whether a rule or form works on the shape of your workforce. A vendor's demo data is built to succeed. Ask to see your records in the vendor's sandbox, or ask what the vendor needs to build one.

Write each question's answer in the vendor's own words next to the score. When two evaluators disagree, the notes show whether they watched the same thing. A gap in scores can come from different demos and not from different opinions.

Table 2. Gates 1 and 2: Reach and Work, with ten questions. This guide's question set, as of November 26, 2026.

#QuestionEvidence to requestWhy it matters for frontline use
1Can a worker with no company email or laptop complete first sign-in?A phone-only account created and signed in on a personal phoneA frontline worker may have no work inbox
2Which languages does the worker experience support, and who sets the language?A language list and a live switch on a phoneA worker who can't read the screen can't finish a task
3Which accessibility standard, version and level does the vendor claim, and when was it tested?A conformance report or statement naming the version and levelA named standard can be checked, and a general claim can't
4Which worker tasks work in the mobile app and which need a browser?A task-by-task list and a live walkthrough on a phoneWorkers may only have a phone
5What happens to a half-finished form when the connection drops?A live test: start a form, drop the connection, returnSpotty connections are a daily fact on some sites
6Can tasks be assigned by rule, such as location, position or status change?A rule built live and the help article naming the criteriaRules replace a coordinator who assigns by hand
7How are forms completed and signed, and where do signed forms and uploads land?A signed form viewed afterward, and the storage locationRecords have to be findable later
8If time or scheduling is in scope, which module covers it and is it in the quoted plan?The module list in the written quoteAn add-on can change the price after the demo
9How does a message reach workers with no email, and can HR see who read it?A live message to a phone-only accountReach is the point of a frontline channel
10What does a site manager see about overdue tasks, and how is it shared?A manager view with overdue items, shown liveManagers act on what they can see
HR Cloud

See how seamless onboarding can transform your workforce.

Book Your Free Demo
HR Cloud Onboard

Gate 3: What Should You Ask About Integrations and Data?

Frontline software seldom stands alone. It sits next to payroll, an HR system, an identity provider and sometimes a scheduling or time tool. Gate 3 asks five questions about how data moves in and out, and who pays for each connection.

Question 11 asks which payroll and HR systems the vendor integrates with, and whether each integration is documented on a first-party page. On a slide, a logo scores 1. A help article that describes setup scores 2. Ask also who maintains each integration when the other system changes.

Question 12 covers single sign-on. Ask which identity providers are documented, what the setup needs from the vendor's support team, and whether the worker-facing apps use the same sign-in. A setup that needs a certificate emailed to support is not a flaw, and it does add a step to your timeline.

Question 13 asks about the API. Request the documentation, the authentication method and any stated limits. Question 14 covers data. Ask how existing records are loaded, how data is exported, in what formats, and what is left out of an export.

Question 15 asks which integrations cost extra and whether they are named in the quote. Add-on pricing can cause late surprises, so ask for the list in writing. Treat an answer of it depends as a score of 0 until the list arrives.

Hypothetical: A committee asks each vendor for the same one-page list of integrations, split into included, extra cost and not offered. The exercise states no result. It makes the three columns comparable across vendors, which a slide deck does not.

Worth knowing: An integration list from the vendor is a statement, and a help article is documentation. Ask for both, and score the weaker one until you see the stronger.

Gate 4: Which Security and Administration Questions Belong in the Matrix?

Security questions work well when they ask for a document or setting. A report, a policy or a settings page gives you something to score, and a reassurance gives you nothing to score. Gate 4 asks five questions, numbered 16 to 20 in Table 3.

Question 16 asks which independent audit reports exist, with scope, period and report type. Ask whether they are shared under a non-disclosure agreement, and ask for the date of the latest one. Question 17 covers data handling. Ask how data is encrypted in transit and at rest, who hosts it, and where it is stored.

Question 18 covers penetration testing. Ask who tested, which products were in scope, when, and whether the report can be shared. Question 19 asks which administrator roles and access profiles exist, and whether access can be limited by location or department. A multi-site enterprise needs a site administrator who sees one site.

Question 20 asks which sign-in protections exist, such as multi-factor sign-in and IP restrictions. Ask whether each is on by default and who can turn it on. Some protections start switched off, and you want that written down before go-live.

Keep security questions in the same matrix as the workflow questions. A separate security review may be scored on a different scale by a different team. Using a single scale shows the committee when a workflow strength sits next to a security gap.

Ask your own security team to review the Gate 4 answers before scoring. They will know which artifacts your policy requires. This guide makes no legal or compliance claims about any vendor, and your counsel and security team set the bar.

Quick note: Record the date each artifact was issued. A report with an old period may describe a system that has since changed.

Table 3. Gates 3 and 4: Connect and Protect, with ten questions. This guide's question set, as of November 26, 2026.

#QuestionEvidence to requestWhy it matters for frontline use
11Which payroll and HR systems are integrated, and is each documented on a first-party page?An integration list with links to each help articlePay and records must agree across systems
12How does single sign-on work, and what does setup need from vendor support?The SSO setup article and a named list of identity providersSetup steps add to the timeline
13Is there an API, and what do the documentation and limits cover?API documentation, authentication method and any stated limitsCustom links to other systems depend on it
14How is existing data loaded and exported, in what formats, and what is excluded?A sample import and a sample export, shown liveMoving data in and out is where projects stall
15Which integrations cost extra, and are they named in the quote?A written list: included, extra cost or unavailableAdd-ons can change the price after the demo
16Which independent audit reports exist, with scope, period and type?The report under non-disclosure, or a written statement of its statusScope and period show what the report covers
17How is data encrypted in transit and at rest, who hosts it and where is it stored?A security FAQ or whitepaper that names eachYour policy may limit where data sits
18What penetration testing exists, by whom, when and with what scope?The report or a written summary, and whether it can be sharedA test with no scope or date says little
19Which administrator roles and access profiles exist, and can they be limited by location?A role list and a live site administrator loginA site administrator should see one site
20Which sign-in protections exist, and are they on by default?The settings pages and who can turn each onDefaults decide what runs on day one

Gate 5: How Do You Score Implementation and Commercial Terms?

Gate 5 asks what you are really buying. A platform is a license plus an implementation plus support, and the quote may describe only the first. Five questions, numbered 21 to 25 in Table 4, cover the rest.

Question 21 asks what implementation includes, in writing. Ask whether setup, configuration, data import and training are included or priced apart. Question 22 asks what timeline the vendor states, what the days include and what is left after the last day.

A stated timeline is a vendor statement and not a prediction for your company. Ask which tasks fall to the vendor and which fall to you. Your own tasks may include sorting your data, choosing your workflows and training your managers. Those can stretch a rollout that the vendor schedules cleanly.

Question 23 asks for the licensing basis, such as seats, headcount bands or modules. Ask what the quote covers and what the renewal terms say. Question 24 asks what support is included, through which channels and during which hours. A site that runs overnight needs to know whether the support hours cover its shifts.

Question 25 covers exit. Ask what happens to your data and stored documents if you leave, and in what format they come back. Exit terms feel premature in a buying meeting, and they are far harder to negotiate after signature.

Hypothetical: A committee gives each vendor the same exit question in writing and compares the answers in one table. The scenario states no result. It shows whether any answer names a format, a timeframe and a cost, and which answers leave those open.

Why this matters for Procurement and RFP Committees: Commercial terms are where your team has room to negotiate and little information. Questions 21 to 25 turn the quote into a list you can negotiate.

Table 4. Gate 5: Commit, with five questions. This guide's question set, as of November 26, 2026.

#QuestionEvidence to requestWhy it matters for frontline use
21What does implementation include, in writing?A scope statement naming setup, configuration, data import and trainingUnpriced items become a second invoice
22What timeline is stated, what do the days include and what remains after?A written plan with owners for each taskYour own tasks stretch a vendor schedule
23What is the licensing basis, what does the quote cover and what are the renewal terms?The quote, the contract draft and the renewal clauseBasis and renewal decide cost over time
24What support is included, through which channels and during which hours?A support description matched to your shift patternOvernight sites need overnight answers
25What happens to your data and stored documents if you leave?A written exit clause naming format, timeframe and costExit terms are hardest to change after signature

Where Does HR Cloud Fit in a Frontline HR Software Evaluation Matrix?

HR Cloud describes itself on its pricing page as a "Modern HR + Employee Experience platform for frontline-heavy enterprises," in the page footer. The same footer says "97% adoption. 6-week go-live." HR Cloud publishes those lines, and this guide has not verified them independently. The Onboard product page adds that Veolia has onboarded more than 10,000 employees through HR Cloud, with over 75% of onboarding completed on mobile.

The pricing page lists Onboard as the base module in all three plans, which are Onboard, Growth and Full Suite. Recruit ATS, Performance Management and Time Off sit in Growth and Full Suite.

Workmates is included in Full Suite, and the page says Employee Engagement is included in Full Suite and optional for Onboard and Growth. Assets and Time Clock remain optional add-ons. Ask HR Cloud which modules your quote includes.

Table 5 lists what HR Cloud's own pages state for each gate, using the same five gates as Tables 2 to 4. The last column lists what was not found on the pages checked. Those pages were the pricing and Onboard pages and the help center articles named in the table. A gap in that column describes those pages only.

Table 5. What HR Cloud's pages state for each gate, and what was not found on pages checked. Opened on November 26, 2026.

GateWhat HR Cloud's pages stateSource pagesNot found on pages checked
ReachWith phone login enabled, either Account Email or Account Phone is needed to create an account, and an activation message carries a password setup link. The display language option is not enabled by default, and the mobile app reflects the phone's languagePhone login article, language articleA list of languages, and an accessibility conformance statement
WorkChecklists start on employment status changes, job detail updates or a fixed date, and assign by criteria such as Department, Location and Position. Dynamic and Background forms can be signed. The Onboarding Dashboard has cards named Total Onboardings, Starting in 7 Days, With Overdue Tasks and UnassignedChecklist article, e-form signing article, dashboard articleWhere signed forms are stored
ConnectThe integrations category lists payroll, applicant tracking, single sign-on, background check and communication articles. The Okta article asks you to email a certificate to support, and the SAML article asks you to deliver a public certificate. The API category lists Documents, Forms, Employee and Task articles. The pricing page says certain third-party integrations may cost extraIntegrations category, Okta article, SAML article, API categoryThe SAML version, API rate limits, and which integrations cost extra
ProtectThe Security FAQ says data is encrypted at rest with AES256 at the device level and in transit with TLS/1.2, and names Rackspace Technology as a hosting partner. Data is stored in California and Virginia and in AWS S3 (US-East-1). A pen test report can be provided under NDASecurity FAQ, 2-step verification article, IP whitelist articleSOC 2 or GDPR wording in the Security FAQ, and audit logs, retention or backups
CommitThe pricing page says setup, configuration, data import, training and in-house support are included, and that the license is tied to headcount bands. It says certain third-party integrations may cost extraPricing pageSupport hours, and exit and data return terms

Several details in Table 5 need a question. The Security category page shows the description "GDPR & SOC2 Data Security" as a subtitle. Inside the Security FAQ article, SOC 2 and GDPR do not appear. Ask HR Cloud for the audit report and its scope, period and type.

On sign-in, the 2-step verification article says the option is disabled by default and support activates it in the backend. Methods are email and an authenticator app, and the article lists SMS as coming soon and chargeable.

The IP whitelist article describes two settings, one for users and one for API calls. Both are disabled by default. The article does not say whether they apply to the mobile app.

Two integration details are worth testing. The Microsoft Entra ID article describes a two-way sync, and it says new hires added in HR Cloud are not added to Entra automatically. A task named Export Employee from HR Cloud to Microsoft Entra ID adds them. Ask whether your joiner process can absorb that step.

HR Cloud may not suit you if your policy needs API rate limits, a named accessibility level or a language list before a demo. None of those appeared on the pages checked. Teams that want single sign-on with no support involvement should also look closely, since the Okta and SAML articles involve HR Cloud support. Ask HR Cloud to confirm activation and configuration of each feature you need.

Remember: A help center article supports a how-to claim and nothing else. It can't show what your account has switched on, so score a documented feature as a 2 until you watch it work.

HR Cloud

Ready to pass your next audit—without the stress?

See how you can simplify compliance and eliminate gaps before they become problems.

Book Your Free Demo
HR Cloud Onboard

How Should the Committee Weigh and Compare Scores?

Set weights before the first demo. Give each gate a weight, and within a gate decide which questions are must-haves. A must-have is a question where a score of 0 ends the vendor's candidacy, and it should be rare. If all 25 questions are must-haves, the matrix has no information in it.

Score independently first. Each evaluator fills in the matrix alone and records the evidence beside each score. Then the committee meets and compares. A score that differs by more than one point between evaluators is a prompt to ask who saw what.

Avoid adding gates into one total without looking at the pieces. A vendor can score well overall and fail a must-have in Gate 4. Show the gate scores side by side as well as the total, and flag any must-have that scored 0 or 1.

Agree a tie rule in advance. One rule is to break a tie on the gate your committee weighted highest. Another is to rerun the demo on the questions where the two vendors differ. Either works if it is written down before the scores are known.

Hypothetical: A committee scores two vendors close to each other overall. One vendor scores higher on Gates 1 and 2, and the other scores higher on Gate 4. The committee returns to its written weights and its must-have list. This scenario states no outcome, and it shows why those two documents should exist before the first demo.

Decide in advance how to treat a gap in the evidence. Showing a feature live on a sample account earns a 3 for that question. Pointing to a help article earns a 2, and the committee can ask for a demo to raise it. If the vendor declines to demo, record that as a fact beside the score.

Handle conflicting sources with a written rule. A marketing page and a help article can describe the same feature differently. This guide lets the help article decide how a feature works, and the pricing page decide what a plan includes. Write your own rule, apply it the same way to each vendor, and record any conflict so the vendor can resolve it in writing.

Keep the matrix short enough to finish. Twenty-five questions is this guide's own choice, and a committee that scores only the questions that matter to its sites will finish sooner. Mark questions that do not apply as not in scope, such as Question 8 when time and scheduling are out of scope. Leave those out of the total, because a 0 means nothing was found and does not mean not applicable.

Send the same request list to each vendor ahead of the demo. The list can include a sample report, a security document, an integration list, an implementation plan and a quote that names its add-ons. A vendor that returns only part of the list has told you something. Give all vendors the same deadline and the same list.

Plan reference calls around the gates. A reference from a similar site can confirm Gate 1 and Gate 5 better than a slide can. Ask the reference which gate they scored lowest at purchase and how that turned out. Score the answer as a 1, since it is a statement you have not seen yourself.

Add the weighted gate scores only after the must-haves are checked. A vendor that scores 0 on a must-have is out of the running whatever the total says. For the rest, show the gate scores next to the total, so the committee sees where each vendor is strong and where it is thin.

Keep a list of the pages and dates behind each 0. A vendor may challenge a 0, and a dated list of pages shows how the score was reached. It also tells your team where to look again before contract signature.

Why this matters for Procurement and RFP Committees: A matrix set up before the demos can be shown to a reviewer without apology. Evidence sits beside each score, and that protects the committee.

Turn the scores into contract language after the committee picks a finalist. Any statement that scored a 1 can go into the order form or the statement of work, so it becomes a written commitment. Ask that stated timelines, included services and named add-ons appear in the same document. A vendor that agrees to write a claim down has told you how firm it is.

Build the matrix in a shared sheet with one row per question and one column set per vendor. Each cell holds the score, a one-line note of the evidence, the page address and the date. Add a column for the evaluator's initials. A sheet like this lets a reviewer trace any number back to its source.

Seat the right people at the table. Site managers know which workflows fail on a floor, and security reviewers read the Protect gate.

Procurement owns the Commit gate, and IT can speak to the Connect gate. Each group scores its own gate first, and then the whole committee compares. Ask each group to write down the one answer that would change its vote. That note gives the committee a short list of questions for a last session with the finalists.

Compare cost on one basis. Put each quote on a single sheet with the license, the add-ons, implementation, training and support in separate rows. A line that one quote includes and another prices apart will show up as a gap in the sheet. Ask each vendor to confirm the sheet in writing before the committee compares totals.

Record who attended each demo and what was shown. A score that rests on a demo only some evaluators saw is hard to defend. Keep the notes in the same file as the matrix, so the evidence and the score stay together.

Plan a second look at renewal. Features launch and plans change, so a 0 from this year's pages may be a 2 next year. Bring the matrix to the renewal meeting, rescore the Connect and Protect gates, and compare your usage with what you were sold. The same scale works for a renewal as for a purchase.

Table 6 lists the decisions to settle before the RFP goes out. Each row has an owner, so nobody has to guess who holds the weights, the must-haves or the tie rule. A short list like this is easy to attach to the RFP file.

Table 6. Decisions to write down before the RFP goes out, with an owner and the evidence to keep. This guide's checklist, as of November 26, 2026.

DecisionOwnerEvidence to keep
Gate weightsCommittee chairWeights written and dated before the first demo
Which questions apply and which are must-havesHR and operationsA marked list with a reason for each must-have
What counts as evidenceProcurementTable 1 adopted in writing
Who scoresProcurement leadNamed evaluators and their roles
Tie ruleCommittee chairA rule written before scores are known
Security review ownerSecurity teamA named reviewer and the artifact list
Pages checked behind each 0ProcurementURLs and dates for each score of 0
Review dateCommittee chairA calendar date and the matrix brought to it

What Can You Start in the Next 48 Hours?

You can begin with three small steps that need a spreadsheet and a few messages.

  1. Copy the 25 questions into a sheet, mark which ones apply to your frontline sites, and mark the must-haves.
  2. Write the weights for the five gates, date the sheet, and share it with your security team for review.
  3. Send the Gate 1 questions to your current or shortlisted vendors, or to HR Cloud, and ask to see a phone-only sign-in.

Start with one step this week.

HR Cloud

Discover how our HR solutions streamline onboarding, boost employee engagement, and simplify HR management

Book Your Free Demo

Frequently Asked Questions

What belongs in an enterprise procurement evaluation matrix for frontline hr software?

An enterprise procurement evaluation matrix for frontline hr software needs questions and a scale. This guide offers 25 questions in five gates, Reach, Work, Connect, Protect and Commit. It scores each answer by evidence, from shown live on your own data to not found on pages checked. Weights are set by your committee before any demo.

How do you score vendor answers in an evaluation matrix?

Score the evidence. A 3 means shown live on your sample data, and a 2 means a first-party page documents it, while writing alone scores a 1. Zero means nothing was found on the pages checked. Each score gets a date, and the pages behind each 0 are listed beside it.

How many questions should a frontline HR software scorecard have?

No source opened for this guide sets a number. This guide uses 25 questions in five gates of five, which is this guide's own choice. Cut questions that do not apply to your sites, and keep the must-haves few, so that a score of 0 on one means something. Revisit the count after the first scoring round.

Which accessibility standard should an HR software vendor name?

The W3C publishes WCAG 2.2, which has 13 guidelines under four principles and three conformance levels, A, AA and AAA. Ask the vendor to name the version and level it claims, and when it was tested. A claim that names no version or level is harder to check. Ask for the conformance report itself.

Does HR Cloud support phone-only sign-in for frontline workers?

HR Cloud's help center describes a phone login option. When it is enabled, an account needs either an email or a phone number, and an activation message carries a link to set a password. The article says Account Manager or support must enable it in the backend, so ask for a live test on a personal phone.

What security details does HR Cloud publish?

The Security FAQ says data is encrypted at rest with AES256 at the device level and in transit with TLS/1.2. It names Rackspace Technology as a hosting partner and says a pen test report can be provided under NDA. SOC 2 does not appear there, so ask for the audit report and its scope.

Is HR Cloud licensed per user?

HR Cloud's pricing page describes an annual license tied to headcount bands, with no per-seat fees. Pricing is by quote, with a Get a quote button instead of a price list. The page says certain third-party integrations may cost extra, so confirm the details in your quote.

Who should score the matrix, and when?

Each evaluator should score alone first, recording the evidence beside each score. The committee then compares scores and discusses any gap of more than one point. Set weights and must-haves before the first demo, so that nobody reshapes them after seeing a favorite vendor. Record the evaluators' names and the demo each person attended.


About the author
Tamalika Biswas Sarkar
Tamalika Biswas SarkarI'm Tamalika Biswas Sarkar, a content specialist focused on creating clear, engaging, and insightful content around HR, workplace trends, and the future of work. I craft content that helps organizations communicate more effectively, strengthen their brand voice, and connect with their audience through well-researched and thoughtfully written pieces.
Share:

Like What You Hear?

We’d love to chat with you more about how HR Cloud® can support your business’s HR needs.

Book Your Free Demo