Total Cost of Hourly Turnover in a Manufacturing Plant
Hypothetical: A plant controller closes the month and sees overtime up on two lines that lost people. The recruiting invoices sit in one file, the scrap report in another, and nobody holds a single figure. This guide shows how to calculate the total cost of hourly turnover in a manufacturing plant and put one defensible number in front of finance.
Labor cost is the base of any estimate. The Bureau of Labor Statistics reports that private industry employer costs averaged $46.89 per hour worked in June 2026. Wages were $32.82 and benefits were $14.07, according to its employer cost release. That figure covers private industry as a whole, so use your own payroll rates in the model.
HR Cloud publishes this guide and sells HR software, so read the HR Cloud section with that in mind. The guide does not rank any vendor. Government figures come from their own pages, and HR Cloud facts come from its help center and site pages. All pages were opened on November 27, 2026, and review sites are not used as sources.
Hourly turnover here means separations of hourly production workers, voluntary and involuntary, counted from your own payroll. Direct costs are costs you can trace to an invoice or a timecard. Lost line productivity is output the line did not make, valued with a margin your plant already uses.
No published standard defines this split, so the structure is this guide's own. Government pages opened for it give no benchmark cost per departure. HR Cloud pages cite only broad percent-of-salary ranges, which this guide does not use. The method below runs on your inputs, and Table 3 shows the arithmetic with labeled illustrative numbers.
Short answer: To calculate the total cost of hourly turnover in a manufacturing plant, add direct costs and lost line productivity for one departure. Then multiply by the number of departures in the period. Use your own payroll rates and production margins, because no government source opened sets a benchmark. Table 2 lists the components, and Table 3 works through an illustrative plant.
Key Takeaways
- Start from facts you can cite. Table 1 lists what the Bureau of Labor Statistics and HR Cloud pages state, and what each one can't tell you about your plant.
- Split each departure into direct costs and lost line productivity. Table 2 lists each component with its formula and the record that feeds it.
- Test the method on a labeled example before you use your own figures. Table 3 walks through illustrative arithmetic that is not a benchmark.
- Pull the data once and document where it lives. Table 4 lists the fields, the owner and the caution that applies to each.
- Check what your systems can supply. Table 5 lists what HR Cloud's help center states about offboarding, reports and exports, and what was not found.
- Get the turnover rate right, because it multiplies the cost. The HR Cloud annual employee turnover calculator shows one way to compute it.
What Do Public Sources Say About Hourly Turnover in a Manufacturing Plant?
Begin with what the public sources can and can't support. The Bureau of Labor Statistics runs the Job Openings and Labor Turnover Survey, known as JOLTS. Its quits table reports preliminary quits rates for September 2026. The total was 2.1, manufacturing was 1.6, durable goods was 1.4 and nondurable goods was 1.9.
The table's footnote defines the rate as the number of quits during the entire month as a percent of employment. That makes it a monthly rate for an industry. It does not describe your plant, and this guide does not convert it into an annual figure.
The bureau's JOLTS FAQ adds the definitions. It says three types of separations are summed to obtain total separations: quits, layoffs and discharges, and other separations. Quits are voluntary, and layoffs and discharges are involuntary and initiated by the employer.
The same FAQ says JOLTS does not collect occupation information, and the page checked does not mention tenure. That means JOLTS can't isolate hourly workers, or workers who left in their first weeks. Treat the manufacturing rate as background on direction and nothing more.
HR Cloud's annual employee turnover calculator covers the rate. It divides departures during the year by average headcount, and it counts voluntary and involuntary exits. The calculation averages the starting and ending headcount and yields a rate. Separately, the page cites a general percent-of-salary replacement range, which this guide does not use.
HR Cloud also publishes a post titled Employee Turnover Costs Guide. The version checked states a percent-of-salary range but no formula for a plant, and this guide does not rely on its figures. Think of it as general reading, and build the plant model from your own records.
Table 1. What public sources state about labor cost and turnover, and what each can't tell you. Opened on November 27, 2026.
| Source | What the page states | What it can't tell you | How this guide uses it |
|---|---|---|---|
| BLS employer costs release | Private industry employer costs averaged $46.89 per hour worked in June 2026, with wages at $32.82 and benefits at $14.07 | A manufacturing figure, because the release text states only the private industry total, or your plant's pay rates | A reminder that loaded cost includes benefits |
| BLS quits table | September 2026 preliminary quits rates of 2.1 total, 1.6 manufacturing, 1.4 durable goods and 1.9 nondurable goods | Hourly workers only, tenure, or an annual rate | Background on direction only |
| BLS JOLTS FAQ | Separations are quits, layoffs and discharges, and other separations. JOLTS does not collect occupation information | Anything about tenure, which the page does not mention | Definitions for your own separation count |
| HR Cloud turnover calculator | Departures during the year divided by average headcount, with voluntary and involuntary exits counted | A plant cost per departure. The page cites a general percent-of-salary range this guide does not use | The rate that multiplies your cost |
Why this matters for Plant Controllers and CFOs: A rate from a public table can start a conversation, but it can't carry a budget line. Table 1 shows where each number stops, so the figure you take to finance comes from your own payroll and production records.
How Do You Calculate the Total Cost of Hourly Turnover in a Manufacturing Plant?
Write the model as two parts for each departure. The first part holds direct costs, the second holds lost line productivity, and the sum is the cost per departure. Multiply that sum by the number of departures in the period, and you have the total cost of hourly turnover for that period.
Direct costs are the items that leave a trail. They include separation handling, the overtime premium paid to cover the open position, hiring costs, and the paid hours spent on onboarding and training. A controller can trace each one to an invoice, a timecard or a payroll line.
Lost line productivity is harder to see because it is output the plant did not make. It includes uncovered station hours, the new hire's output gap against a trained worker, and added scrap and rework. You value each hour with a figure your plant already uses, such as a contribution margin per line hour.
Models that stop at direct costs leave out the output side. Table 3 shows how large that side can be under one set of inputs. Your own inputs decide whether it is large or small for your plant.
One rule keeps the model honest. Count each hour once. If overtime covers a vacant station, the premium is a direct cost and the covered hours lose no output. When nobody covers the station, the hours go in lost output instead.
The same rule applies to the person who trains the replacement. Trainer hours are paid hours, so they sit in direct costs. If the trainer's own station then runs short, those uncovered hours belong in lost output, and the model should show both lines.
Tag each departure as voluntary or involuntary, using the JOLTS terms as a guide. The costs can differ, because a planned termination may allow a replacement to be ready before the exit date. Keep the model able to show the two groups apart, even if you add them together in the end.
Table 2. Components of the cost of one hourly departure, with the formula and the record that feeds each one. This guide's framework, as of November 27, 2026.
| Component | Type | Formula | Record that feeds it |
|---|---|---|---|
| Separation handling | Direct | Hours spent on exit steps multiplied by the loaded rate of the person doing them | Timecards or HR task logs |
| Vacancy overtime premium | Direct | Hours covered by overtime multiplied by the premium portion of the overtime rate | Payroll overtime lines by cost center |
| Hiring | Direct | Advertising, screening fees and recruiter hours for the replacement | Accounts payable and HR time records |
| Onboarding and training | Direct | Paid hours of the new hire, trainer and supervisor, multiplied by loaded rates | Timecards and the training schedule |
| Uncovered vacancy output | Lost line productivity | Station hours with nobody assigned, multiplied by your value per line hour | Production schedule and downtime log |
| Ramp-up gap | Lost line productivity | Share of expected output missed during the ramp-up period, multiplied by hours and loaded rate | Output by worker or crew, and the training plan |
| Added scrap and rework | Lost line productivity | Extra scrap and rework cost tied to the new hire's early weeks | Quality system and scrap reports |
Pro tip: Keep a short assumptions sheet beside the model. For each component, write the source of the input, the date it was pulled and the person who owns it. A number with a named owner survives a question from the CFO.

Make Every Exit Clean and Audit-Ready
See how HR Cloud handles every departure, start to finish.
- Automate tasks across HR, IT, and Finance
- Revoke access and recover assets instantly
- Never miss a step — for every departure, every time
What Counts as a Direct Cost of Hourly Turnover?
Direct costs are the part of the model a controller can audit line by line. Each one comes from a record that already exists, so the work is in collecting them for the right departures. Table 2 lists four direct components, and each one needs a clear boundary.
Separation handling covers the paid hours spent closing out the employee. Think of final pay processing, equipment return, access removal and any exit checklist. Multiply the hours by the loaded rate of whoever did the work. The loaded rate adds benefits and payroll taxes to wages, as the Bureau of Labor Statistics release does when it reports wages and benefits together.
The vacancy overtime premium needs care. When overtime covers an open position, the straight-time portion of those hours replaces wages you no longer pay the departed worker. Only the premium portion is a cost caused by the departure. Pull the overtime lines for the cost center and keep the premium apart from the base pay.
Hiring costs include advertising, screening fees and the recruiter and interviewer hours spent on the replacement. Accounts payable holds the invoices, and HR or supervisors hold the hours. If the plant uses a staffing agency, include its fee for the replacement on the same line.
Onboarding and training costs are paid hours with little output attached. Count the new hire's orientation and shadowing hours, the trainer's hours and the supervisor's coaching time. Add the cost of protective equipment, uniforms and badges issued to the new hire if those items are not reusable.
Leave out costs you can't tie to a record. Morale, customer goodwill and the effect on coworkers may be real, but a controller can't audit them. If you want to mention them, label them as estimates and keep them apart from the traced total.
Voluntary and involuntary exits can both carry these costs. The JOLTS terms give you a vocabulary for tagging them, with quits on one side and layoffs and discharges on the other. Tag each departure when you pull it, because retagging a year of records later takes far more time.
Worth knowing: The straight-time portion of covered hours is a line that is easy to double count. If the model charges full overtime pay for the vacancy, it charges for work the plant would have paid for anyway. Charge the premium and leave the base wage out.
How Do You Price Lost Line Productivity?
Lost line productivity is the value of output the line did not produce because of a departure. It has three parts in this guide's model: uncovered vacancy hours, the ramp-up gap and added scrap or rework. Each part needs a value per hour or per unit that finance already accepts.
Start with the value of a line hour. Many plants already carry a contribution margin per labor hour or per machine hour in their costing. Use the figure your plant uses and write down where it came from. If you invent a new rate, finance will spend the meeting debating the rate instead of the result.
Uncovered vacancy hours are the hours a station ran with nobody assigned. The production schedule and the downtime log show them. Ask the production manager whether the plant made up the output later at no extra cost, because recovered output shrinks the loss.
The ramp-up gap is the output a new hire does not yet produce compared with a trained worker. No source opened for this guide gives a standard ramp-up period or a standard output curve. Take the period from your own training plan, or from the output records of past hires at the same station.
When the plant doesn't track output by worker, use crew output before and after the new hire joined. Show a low case, a base case and a high case for the gap, and say which records support each one. A range is easier to defend than a single number with no basis.
Added scrap and rework come from the quality system. Scrap rises for many reasons, so attribute only the excess above the station's normal level, and state how you set that level. A new hire's scrap should be tied to the shift and station where the person worked.
Each departure starts one replacement cycle. The cycle holds the vacancy, the hiring, the onboarding and the ramp-up. Assign the cost of that cycle to the departure that began it. An early quit that triggers a second cycle then shows up as two departures with their own costs.
Where the data helps: Production data turns the ramp-up gap from an opinion into a record. A crew's output by week, set beside the hire date, lets finance see how long the gap lasted. Without it, the gap is a supervisor's estimate, and the model should say so.
What Does a Worked Example Look Like?
A worked example shows the arithmetic before you commit your own figures. The one below is hypothetical, and each input is illustrative. None of the inputs comes from a source, and none is a benchmark for any plant.
Hypothetical: A plant has an average hourly headcount of 200 and records 70 departures in a year. That gives a turnover rate of 35 percent, using departures divided by average headcount. A vacancy lasts 12 shifts of 8 hours, or 96 hours, and overtime covers 80 of them while 16 hours go uncovered.
The other inputs appear in Table 3, and they are all assumptions. They include a loaded rate of $30 for the new hire and a value of $60 per uncovered line hour. The ramp-up gap is 30 percent of expected output over 320 hours, which is eight weeks of 40 hours.
The arithmetic gives a direct subtotal of $2,508 and a lost line productivity subtotal of $4,040. Together they make a cost per departure of $6,548, and 70 departures give a period total of $458,360. In this example, lost line productivity is the larger part, and that follows from the inputs chosen.
A sensitivity check shows why ranges matter. If the ramp-up gap is 20 percent instead of 30 percent, the cost per departure falls to $5,588 and the period total falls to $391,160. One assumption moved the total by $67,200, so document that input first.
Table 3. Hypothetical worked example with illustrative inputs. These figures come from no source and are not a benchmark. As of November 27, 2026.
| Line | Illustrative input | Arithmetic | Amount |
|---|---|---|---|
| Separation handling | 1.5 hours at a $40 loaded rate | 1.5 × 40 | $60 |
| Vacancy overtime premium | 80 covered hours at an $11 premium | 80 × 11 | $880 |
| Hiring | $150 advertising, 6 recruiter hours at $45, $120 screening | 150 + 270 + 120 | $540 |
| Onboarding and training | 8 new-hire hours at $30, 16 trainer hours at $38, 4 supervisor hours at $45 | 240 + 608 + 180 | $1,028 |
| Direct subtotal | Sum of the four direct lines | 60 + 880 + 540 + 1,028 | $2,508 |
| Uncovered vacancy output | 16 hours at $60 per line hour | 16 × 60 | $960 |
| Ramp-up gap | 30 percent gap over 320 hours at $30 | 0.30 × 320 × 30 | $2,880 |
| Added scrap and rework | Flat allowance for the early weeks | Input as stated | $200 |
| Lost line productivity subtotal | Sum of the three lost lines | 960 + 2,880 + 200 | $4,040 |
| Cost per departure | Direct plus lost | 2,508 + 4,040 | $6,548 |
| Period total | 70 departures | 70 × 6,548 | $458,360 |
Quick note: Put your own numbers in a copy of this table and keep the illustrative column beside it. Reviewers can compare the two and see which inputs you changed. That comparison also shows which inputs need a source before the memo goes out.
Which Records Do You Pull to Calculate the Total Cost of Hourly Turnover?
To calculate the total cost of hourly turnover, you need records from three places: payroll or the HR system, accounts payable and the production floor. Table 4 lists the fields. The goal is a single sheet with one row per departure and one column per input in Table 2.
Start with the departure list. Each row needs the departure date, the type of separation, the line or cost center and the hire date of the person who left. The hire date lets you see how long the person worked, which helps when you review early exits.
Next, add the vacancy dates. The vacancy starts on the departure date and ends when the replacement works a first shift. Overtime hours and uncovered hours fall inside that window, so the dates let you pull them from payroll and the schedule.
Then add the hiring and training inputs. Accounts payable gives the invoices, and timecards give the hours. The production system gives output, downtime and scrap for the line during the vacancy and the ramp-up period.
Reconcile the sheet before you trust it. Total the overtime premium and the hiring invoices for the period, and compare each total with the ledger. A gap means a departure is missing or an invoice is matched twice. Resolve gaps before you add the production inputs.
Decide who owns each field before the pull starts. A field with no owner goes stale, and the model stops matching the ledger. Write the owner and the pull date on the assumptions sheet.
Table 4. Fields to pull for the cost model, where each may live, the question it answers and a caution. This guide's checklist, as of November 27, 2026.
| Field | Where it may live | Question it answers | Caution |
|---|---|---|---|
| Departure date and type | Payroll or HR system | Which exits belong in the period, and are they voluntary or involuntary | Use one rule for the date, such as last day worked |
| Hire date and line | HR system and the schedule | How long the person worked and where | Rehires need a rule so tenure isn't reset by accident |
| Vacancy start and fill dates | HR system and the schedule | How many hours the position sat open | Define fill as the first shift worked |
| Overtime premium hours | Payroll by cost center | How much overtime covered the vacancy | Split premium from base pay |
| Hiring invoices and hours | Accounts payable and recruiter logs | What the replacement cost to find | Match each invoice to a departure |
| Training hours | Timecards and the training schedule | How many paid hours went to onboarding | Include trainer and supervisor hours |
| Output and downtime by line | Production system | What the line did not make | Check whether output was recovered later |
| Scrap and rework by station and shift | Quality system | How much extra scrap followed the hire | Count only the excess over the normal level |
Remember: A model built on records from one plant is only as good as the rules behind each field. Write the rule for departure date, vacancy end and scrap attribution once, and apply it to each row. Consistent rules make a smaller number more credible than a large number with shifting definitions.

Where Does HR Cloud Fit in Tracking the Total Cost of Hourly Turnover?
HR Cloud is an HR platform, and it does not replace a cost model. Its pages describe offboarding, an HR record for each employee and reports. That makes the platform a source of departure records for the first columns of your sheet. The cost columns still come from payroll, accounts payable and the production floor.
On the plan question, the pricing page says Onboard covers onboarding, offboarding and People HRIS. It lists reports and insights as included in Onboard, Growth and Full Suite. The same page says Assets and Time Clock remain optional add-ons. Setup and configuration are included, according to the page, so confirm the scope for your account.
The help center describes how a termination is recorded. Its terminate article names an Effective Date field and says an offboarding checklist will be triggered if one is set up. A second article says the effective date is recorded as the separation date on the employee's profile. That gives you a dated record for the departure list in Table 4.
Reports are the other piece. The help center's export article lists CSV, Excel and PDF formats. It also says an export includes only the columns in the report's view. Capturing more than the first page requires the select-all option.
The Snapshot and Activity article describes two report types. A Snapshot report shows the applied data on a specific date, built from history records. An Activity report shows updated data in the system, including each entity. The article names no hire date, termination date or employment status field, so ask which fields a report view can hold.
Several things were not found on the pages checked. No page opened describes a cost-per-departure report, and none describes a connection to production, scrap or downtime data. The terminate article lists no reason field. If you need any of these, ask HR Cloud to show them in a demo, and plan to supply them from your other systems.
HR Cloud is also not a payroll system. No payroll feature was found on the pages checked, so plan to keep running payroll in your current system. If your plant needs a cost model today, a spreadsheet or your finance system is the right home for it. HR Cloud is a fit when the weak point is the record of who left, when and which checklist followed.
Table 5. What HR Cloud's pages state for each input to the cost model, and what was not found on pages checked. Opened on November 27, 2026.
| Need | What HR Cloud's pages state | Not found on pages checked, or confirm | Source |
|---|---|---|---|
| Dated departure record | The terminate article names an Effective Date field. The effective date is recorded as the separation date on the profile | A reason field, which the terminate article's field list does not show | Terminate article |
| Exit tasks | A set-up offboarding checklist will be triggered. It starts when the termination process is initiated | Hours spent on each task | What happens when an employee is terminated |
| Reports and exports | Exports in CSV, Excel and PDF, with only the view's columns. Snapshot and Activity report types exist | Whether a view can hold hire date, termination date and status. Confirm in a demo | Export article |
| Plan placement | Onboard covers onboarding, offboarding and People HRIS. Reports and insights are marked included in all three plans | Activation and configuration for your account. Time Clock is an optional add-on | Pricing page |
| Production, scrap and downtime data | Not found in the articles checked | A connection to production systems. Plan to supply this from your own systems | Terminate article |
Why this matters for Plant Controllers and CFOs: A system earns a place in the model by supplying a specific column. Table 5 maps HR Cloud to the departure columns and marks the rest as your own data. That keeps the vendor conversation focused on what the platform documents.
How Do You Present the Number to Finance Leadership?
Lead with the method, then show the number. A CFO who sees the formula and the assumptions sheet can test the result, and a CFO who sees only a total will question it. Show the cost per departure, the period total and the range from your low and high cases.
Show finance the two or three inputs that move the total by the largest amount. In Table 3, the ramp-up gap is the largest line. Rank your own inputs the same way, and spend your effort sourcing those first.
Separate traced costs from estimated costs on the page. Direct costs trace to invoices and timecards, so label them as traced. Lost line productivity depends on a value per line hour and a ramp-up gap, so label it as estimated and show the inputs.
Say which departures are in the count. JOLTS places retirements and transfers outside quits, according to its FAQ. Decide whether your plant treats retirements as part of the avoidable pool, and write the rule at the top of the memo. A clear rule keeps the discussion on the model.
Then connect the cost to a decision. A retention action pays for itself when it prevents enough departures to cover its cost. The break-even count is the cost of the action divided by the cost per departure.
Hypothetical: A retention program costs $20,000. Using the illustrative cost per departure of $6,548 from Table 3, the break-even is about 3.1 departures. That arithmetic states the bar the program must clear, and it does not say whether any program will clear it.
Keep the memo short. One page with the formula, the assumptions sheet, the range and the break-even rule is enough to start a conversation. Attach the departure list so finance can sample rows against the ledger.
Pro tip: Offer finance a way to audit three departures end to end. Pick one from each of three months, and walk each cost line back to its invoice, timecard or production record. A clean audit of three rows earns trust for the other rows.
How Do You Keep the Cost Number Current?
A cost model drifts if nobody maintains it. Loaded rates change when payroll changes, and the production system changes the value of a line hour. Set a review date when you publish the first version, and tie it to your normal close.
Version the assumptions sheet. Each change to a rate, a margin or a ramp-up gap should carry a date and a reason. When the total moves, you can then say whether the cause was a change in turnover or a change in an input.
Track the rate and the cost together. The turnover rate from the HR Cloud calculator tells you how often a cycle starts. Cost per departure tells you how much each cycle costs. A falling rate with a rising cost per departure needs a different response from the reverse.
Revisit the ramp-up gap when you have new output data. It is the input with the weakest support in a first version. The sensitivity check in Table 3 shows how much it can move the total. Replace the supervisor's estimate with a crew record as soon as one exists.
Share each refreshed figure with the people who own the inputs. The production manager can confirm the line-hour value, and payroll can confirm the loaded rates. Their sign-off on the assumptions sheet makes the next review shorter.
Finally, keep the scope stable. If you add a new cost line, such as a sign-on bonus, add it for all periods you compare. Mixed scopes make a trend look like progress or decline when only the definition changed.
Worth knowing: A model that finance can rerun will survive a staffing change. Document the steps in plain language, and store the sheet where the next controller can find it. The method outlasts any one person's memory.
What Can You Start in the Next 48 Hours?
You can begin without new software or a budget request. These three steps use records you already hold.
- Pull the list of hourly departures for the last 12 months from payroll, and tag each one as voluntary or involuntary.
- Copy Table 3 into a spreadsheet and replace each illustrative input with your plant's value, writing the source beside each one.
- Ask the production manager for the output and downtime records of one line during one recent vacancy.
Start with one step this week.
Discover how our HR solutions streamline onboarding, boost employee engagement, and simplify HR management
Book Your Free DemoFrequently Asked Questions
How do you calculate the total cost of hourly turnover in a manufacturing plant?
To calculate the total cost of hourly turnover in a manufacturing plant, add direct costs and lost line productivity for one departure. Then multiply by departures in the period. Direct costs cover separation handling, overtime premium, hiring and onboarding, while lost line productivity covers uncovered hours, the ramp-up gap and added scrap. Use your own payroll and production records.
What is the difference between direct cost and lost line productivity?
Direct costs trace to an invoice, a timecard or a payroll line, such as advertising, screening fees and trainer hours. Lost line productivity is output the line did not produce, such as uncovered station hours or a new hire's ramp-up gap. You value it with a figure your plant already uses. Count each hour once, in only one category.
Does the Bureau of Labor Statistics publish a cost per hourly departure for manufacturing?
No page opened for this guide shows one. The employer cost release reports $46.89 per hour worked for private industry in June 2026. JOLTS reports a manufacturing quits rate of 1.6 for September 2026, preliminary. Neither gives a cost per departure, so build the figure from your own records.
How do you value an hour of lost output?
Use a figure your plant already accepts, such as contribution margin per labor hour or per machine hour, and write down its source. Then multiply by the hours the station ran short. Ask the production manager whether the plant recovered the output later at no extra cost, because recovered output reduces the loss you should count.
How do you calculate the hourly turnover rate?
HR Cloud's turnover calculator page divides departures during the year by average headcount. It counts voluntary and involuntary exits, and it averages the starting and ending headcount. For example, 70 departures on an average headcount of 200 gives a rate of 35 percent. That example is illustrative and not a benchmark for any plant.
Should voluntary and involuntary exits be costed together?
Tag them separately, then decide how to report them. The JOLTS FAQ treats quits as voluntary and layoffs and discharges as involuntary, and the two can carry different costs. A planned termination may let a replacement be ready sooner. Show both groups and their sum, so finance can see how each one contributes.
What does HR Cloud's help center say about exporting reports?
The export article lists CSV, Excel and PDF formats. An export includes only the columns in the report's view. Without the select-all option, you capture only the first page. The article states no export permissions, so ask HR Cloud which roles can export in your account.
How many departures must a retention program prevent to pay for itself?
Divide the program's cost by the cost per departure. A $20,000 program and an illustrative cost per departure of $6,548 give a break-even of about 3.1 departures. That is arithmetic with hypothetical numbers. It does not predict any program's effect, so use your own cost and your own model.
About the author

Like What You Hear?
We’d love to chat with you more about how HR Cloud® can support your business’s HR needs.
Book Your Free Demo